81331 Rev 01 Nov 2010
80
Test 3 - This is a measurement of the insulation between the transformer high
voltage winding and the low voltage winding. Connections are exactly the same
as for Test 1 and 2. Test mode is UST-R.
NOTE: Once Tests 1, 2 and 3 are completed, Line 4 will populate with values
calculated by subtracting Test 2 from Test 1. This is applicable for
values of capacitance, current and watts. Line 4 is a calculated
comparison to the direct measurements of Test 3. Values on these two
lines should be essentially the same. If they are not, re-check all
connections and verify the proper operation of the test set. If Test 3 and
Line 4 vary by more than 2%, the Insulation Rating (IR) will
automatically populate with B (Bad).
Test 5 - This is a measurement of the insulation between the transformer low
voltage winding and the transformer tank, plus the insulation between the low
voltage winding and the tertiary winding, both measured in parallel. Connect the
HV cable to the low side (L) winding, connect the Red lead to the H winding and
Blue lead to the T (tertiary) winding.. Test mode is GSTg-R.
Test 6 - This is a measurement of the insulation between the transformer low
voltage winding and the transformer tank. Connections are exactly the same as
for Test 5. Test mode is GSTg-RB.
Test 7 - This is a measurement of the insulation between the transformer low
voltage winding and the high voltage winding. Connections are exactly the same
as for Test 5 and 6. Test mode is UST-B.
NOTE: Once Tests 5, 6 and 7 are completed, Line 8 will populate with values
calculated by subtracting Test 6 from Test 5. This is applicable for
values of capacitance, current and watts. Line 8 is a calculated
comparison to the direct measurements of Test 7. Values on these two
lines should be essentially the same. If they are not, re-check all
connections and verify the proper operation of the test set. If Test 7 and
Line 8 vary by more than 2%, the Insulation Rating (IR) will
automatically populate with B (Bad).
Test 9 - This is a measurement of the insulation between the transformer tertiary
winding (T) and the transformer tank, plus the insulation between the tertiary
winding (T) and high voltage winding (H), both measured in parallel. Connect
the HV cable to tertiary winding (T), connect the Red lead to the L winding and
Blue lead to the L winding.. Test mode is GSTg-B.
Test 10 - This is a measurement of the insulation between the transformer
tertiary winding and the transformer tank. Connections are exactly the same as
for Test 5. Test mode is GSTg-RB.